Asbestos Glossary: Terms You’ll See on Test Reports and Regulations

Asbestos testing and regulation use specific terminology that isn’t always explained. This glossary covers the terms you’re most likely to encounter.

Found this useful? Send it to someone who needs it.
Key Takeaways
  • Friable material easily releases fibers; non-friable material is stable unless significantly disturbed.
  • PLM is the standard bulk sample testing method; TEM is more sensitive for specific situations.
  • Abatement is permanent removal; encapsulation is a sealing-based interim control.
  • NESHAP governs federal asbestos removal and disposal requirements.

Material Condition Terms

Friable: material that can be crumbled by hand pressure, releasing fibers easily — the higher-risk category. Non-friable: material that’s bound into a stable form (like vinyl floor tile) and doesn’t easily release fibers unless damaged or disturbed significantly.

Testing Terms

PLM (Polarized Light Microscopy): the standard lab method for identifying asbestos in bulk material samples. TEM (Transmission Electron Microscopy): a more sensitive method, sometimes used for air sampling or when PLM results are inconclusive.

Lowest sticker price
Asbestos Test Kit, 2 Samples, Lab Fee Charged Separately
Asbestos Test Kit, 2 Samples, Lab Fee Charged Separately

The lowest sticker price here, but the laboratory fee is not included in it. You collect two samples, mail them in, and pay the lab separately for each sample you submit. The listing puts that fee at $20 per sample, which brings a two-sample job to roughly the same total as the kits that bundle the analysis, so treat the low sticker as a deposit rather than the price.

2 samplesLab fee extraEmailed results
Check Price on Amazon › As an Amazon Associate we earn from qualifying purchases.

Remediation Terms

Abatement: permanent removal of asbestos-containing material. Encapsulation: sealing material in place to prevent fiber release, an interim control similar in concept to lead paint encapsulation. NESHAP: the EPA’s National Emission Standards for Hazardous Air Pollutants, which governs asbestos removal and disposal requirements.

Most recognised brand
PRO-LAB Asbestos Test Kit, You Collect 2 Samples
PRO-LAB Asbestos Test Kit, You Collect 2 Samples

PRO-LAB is the kit most home inspectors and hardware stores stock, so results tend to be accepted without argument by contractors and buyers. Two samples covers the common case of one suspect material plus a control.

2 samplesAccredited labWidely recognised
Check Price on Amazon › As an Amazon Associate we earn from qualifying purchases.

Other Control Method Terms

Enclosure: building a permanent airtight barrier around a material so that it stays in place but is separated from the occupied space. This differs from encapsulation above, which seals the surface of the material itself rather than constructing a separate barrier around it.

Operations and maintenance program: a documented routine for managing material left in place, covering periodic inspection, record keeping and the precautions trades are expected to follow. The term appears most often in commercial settings, but the underlying idea applies to a house where material has been left intact.

Process and Paperwork Terms

Containment: the sealed work area, typically held under negative pressure, that keeps fibers released during work from reaching the rest of the building. Clearance: the assessment carried out after work to confirm the area is suitable to reoccupy, often performed by a party independent of the contractor.

Chain of custody: the record that accompanies a sample from collection through analysis, documenting who handled it and when. Homogeneous area: a grouping of material that appears uniform in type and age, which is how sampling is usually planned, since one result is taken to represent the group rather than a single spot.

FAQ

What’s the difference between friable and non-friable asbestos?
Friable material crumbles easily by hand and releases fibers readily; non-friable material is bound into a stable form and doesn’t easily release fibers unless significantly damaged.

Why does my report use a term my contractor did not?
Laboratory reports describe what was analyzed and tend to use analytical language, while contractors describe what will be done on site. The two vocabularies only partly overlap. If a term on either document is unclear, ask the party who wrote it what it means for your specific material.

Important

This glossary is for general orientation — refer to your specific test report or contractor’s documentation for terms not covered here.

These statements have not been evaluated by the Food and Drug Administration. This information is not intended to diagnose, treat, cure, or prevent any disease. Content is for informational purposes only and is not medical advice; consult a qualified healthcare provider before starting any supplement. As an Amazon Associate we earn from qualifying purchases.

Found this useful? Send it to someone who needs it.
Scroll to Top
© 2026 Asbestos Action Plan — Health Disclaimer  |  Affiliate Disclosure  |  Privacy Policy  |  Terms  |  About
As an Amazon Associate we earn from qualifying purchases.